Shandong Gas Pipeline Network 山东输气管网 is a pipeline network with gas pipelines that are operating, in construction, and proposed in Shandong Province, China.
Location
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.2062604238151,"lon":117.94224251368392,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":6,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Network Background
The gas source for Shandong province is mainly from Sinopec Ordos Gas Field, Shengli and Zhongyuan Oil Field Associated Gas, Shandong LNG Import gas, PetroChina Changqing Gas Field and Central Asia Import, CNOOC Bonan Gas Field (中海油渤南气田).[1]
The mid-segment of China-Russia East gas pipeline was completed in December 2020, adding another gas source to Shandong Province.[2]
In 2015, there are 50 gas pipelines reaching 17 major cities in the province. The total mileage is 6,250 kilometers.[1]
In Shandong province 14th Five-Year Plan on Energy, the province plans to increase the gas supply from 8 billion cubic meters in 2015 to 40 billion cubic meters in 2025. The mileage of gas pipeline will pass 8,000 kilometers, possible 10,000 kilometers by 2025. [3]
The gas source of the West Trunk and the North Trunk are Longkou LNG Terminal , Penglai LNG Terminal , Yantai LNG Terminal and Dongying LNG Terminal , with a design pressure of 10 MPa.[4] The gas source of the South Trunk pipeline is Shandong LNG Terminal and Rizhao LNG Terminal .[5]
Network details
East Trunk Line 东干线
The pipeline starts from Longkou LNG Terminal in Yantai and ends at Hedong District, Linyi. It passes through five cities: Yantai, Qingdao, Weifang, Rizhao, and Linyi, with a total length of 524.5 kilometres. The pipeline consists of a trunk line, a branch, and a connecting line. Initially, its capacity will be 13.9 billion cubic meters per year, and it will increase to 30.2 billion cubic meters per year after a pressure upgrade.[6] The designed pressure is 10 MPa.[7]
Operator:
Owner: 山东省东南管道天然气有限公司[8]
Current capacity:
Proposed capacity: 13.9 bcm/year[9]
Length: 524.5 km[9]
Diameter: 1219 mm[7]
Status: Construction[10]
Start year:
West Trunk Line 西干线
The pipeline runs from Dezhou to Jining, Shandong province, China. There is also a 34 km branch running from Guguantun to Yanggu.[11] [12]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.493212,"lon":116.3203656,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":37.295567,"lon":116.272905},{"lat":37.183014,"lon":116.122675},{"lat":36.577643,"lon":116.144155},{"lat":36.313043,"lon":116.174955},{"lat":36.206098,"lon":116.300361},{"lat":36.007387,"lon":116.371075},{"lat":35.541026,"lon":116.390698}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.313043,"lon":116.174955},{"lat":36.209068,"lon":115.904559}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator: Shandong Oil&Natural Gas Company 山东石油天然气股份有限公司[13]
Parent Company: Shandong Luxin Group 43.3923%; Zhongran Gas Industrial Shenzhen Company 中燃燃气实业(深圳)有限公司 41.0000%; Shandong State-owned Assets Supervision and Administration Commission 山东省人民政府国有资产监督管理委员会 5.6077% ; Shandong Caijin Investment Group 山东省财金投资集团有限公司 4.1752%; 44 institutional shareholders 44个法人股东 3.9197%; 山钢金控资产管理(深圳)有限公司 1.5657%; 285 natural person shareholders 285个自然人股东 0.3394%
Current capacity:
Proposed capacity: 20 bcm/year[11]
Length: 195.7mi / 315 km[13]
Diameter: 100 mm[13]
Status: Construction[14]
Start Year:
South Trunk Line 南干线
The pipeline runs from Lanshan District, Rizhao, Shandong To the boarder between Shandong and Henan, China.[5] [15] [16]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":35.293212,"lon":117.503656,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":35.184393,"lon":119.182339},{"lat":35.157273,"lon":119.047009},{"lat":35.343809,"lon":116.431303},{"lat":35.459747,"lon":116.091735},{"lat":35.473353,"lon":115.943677},{"lat":35.495311,"lon":115.358165}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":6,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator: Shandong Southeast Natural Gas Pipeline Company 山东省东南管道天然气有限公司[17]
Parent Company: Luxin Group, Sinopec
Current capacity: 15.6 bcm/year
Proposed capacity: 33 bcm/year[17]
Length: 329.95 mi / 510 km[17]
Status: Operating[18]
Start Year: 2023[18]
North Trunk Line 北干线
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor .
Sub-articles:
The pipeline runs from Longkou LNG, Longkou, Yantai, to Dezhou and Laishan, Shandong province, China.[11]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":37.293212,"lon":118.503656,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":37.562147,"lon":120.34577},{"lat":37.628137,"lon":120.877752},{"lat":37.340395,"lon":121.346608}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":37.628137,"lon":120.877752},{"lat":37.400035,"lon":120.278433},{"lat":37.226907,"lon":120.078124},{"lat":36.960176,"lon":119.167488},{"lat":37.271018,"lon":118.375495},{"lat":37.554692,"lon":118.032563},{"lat":37.377368,"lon":117.769052},{"lat":37.362533,"lon":117.227016},{"lat":37.286907,"lon":116.421108},{"lat":37.283839,"lon":116.266084}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":6,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator: Shandong Oil&Natural Gas Company 山东石油天然气股份有限公司
Parent Company: Shandong Luxin Group (43.3923%); Zhongran Gas Industrial Shenzhen Company 中燃燃气实业 (深圳 )有限公司 (41%); Shandong State-owned Assets Supervision and Administration Commission 山东省人民政府国有资产监督管理委员会 (5.6077%) ; Shandong Caijin Investment Group 山东省财金投资集团有限公司 (4.1752%); 44 corporate shareholders (其他44个法人股东) (3.9197%); Shangang Financial Holdings Asset Management (Shenzhen) Co., Ltd. 山钢金控资产管理 (深圳) 有限公司 (1.5657%); 285 individual shareholders (个自然人股东) (0.3394%)
Current capacity:
Proposed capacity: 35 bcm/year[4]
Length: 447.4 mi / 720 km
Diameter: DN1200/DN1000 mm[4]
Status: Proposed[19]
Start Year:
Shandong LNG Terminal Transport Pipeline 山东LNG输气干线
Shandong LNG Terminal Transport Pipeline 山东LNG输气干线 is an operating natural gas pipeline in China.[20] Shandong LNG Terminal Transport Pipeline Phase II was discussed in the Shandong Province 13th Five-Year Plan.[21] As of October 2021, there was no formal evidence that it had been constructed or become operational, despite ongoing expansions at the Shandong LNG Terminal.[22]
山东LNG输气干线
The pipeline runs from Qingdao LNG imported gasification in Dongjiakou, Qingdao, Shandong to Laixi, Qingdao, Shandong.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.1,"lon":120.1,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":35.591759,"lon":119.757205},{"lat":36.823812,"lon":120.512569}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Parent Company: PipeChina[20]
Current capacity:
Proposed capacity: 6.72 billion cubic meters per year[20]
Length: 199.8 kilometers[20]
Status: Operating[20]
Start Year: 2014[23]
山东LNG输气干线 Phase II
The pipeline runs from Laixi, Qingdao Shandong, to Yantai, Shandong.[21]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":37.1,"lon":120.9,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.823812,"lon":120.512569},{"lat":37.404238,"lon":121.429276}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Parent company: PipeChina
Capacity: 6 billion cubic meters per year
Length: 263 kilometers
Status: Operating[24]
Start year: 2021[24]
Tai'an-Qingdao-Weihai Gas Pipeline 泰青威输气管线
Tai'an-Qingdao-Weihai gas pipeline 泰青威输气管线 is an operating natural gas pipeline.[25] The pipeline is owned and operated by PetroChina. The pipeline carries gas sourced from West-East Gas Pipeline 2 .
At about 5:07 on March 20, 2019, at K169+200 meters of Tai'an-Qingdao-Weihai Gas Pipeline (located in the northeast of Zhujiapo Village, Songshan Eco-tourism Zone, Linqu County, Weifang, Shandong province, China), a natural gas leak, explosion and fire accident occurred. The accident caused no casualties, and the direct economic loss was 9.051643 million RMB.[26]
The pipeline runs from Tai'an, through Qingdao to Weihai, Shandong Province, China.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.7,"lon":119.666953,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.197698,"lon":116.9239},{"lat":36.461499,"lon":117.839582},{"lat":36.63635,"lon":119.950784},{"lat":37.330404,"lon":121.94356}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":6,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Main Line (泰安-青岛-威海)
Operator: CNPC Shandong Natural Gas Pipeline Company (中石油山东天然气管道有限公司)
Parent Company: China Nationial Petroleum Corporation 70%; Shandong Natural Gas Pipeline Investment Company (山东省天然气管网投资有限公司) 30.00%.
Current Capacity: 8.6 bcm/year
Proposed Capacity:
Length: 663 miles / 1067 kilometers (Major pipeline 556 km)[27]
Status: Operating
Start Year: 2011[28] , 2015[25]
Zibo Branch 淄博支线
The pipeline runs from West-East Gas Pipeline 2 in Zibo, Shandong, China.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.77,"lon":118,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.461499,"lon":117.839582},{"lat":37.110027,"lon":118.354022}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner:
Parent company:
Capacity: 1.62 bcm/year
Length: 100.7 kilometers
Diameter: 508 mm
Status:
Start year: 2013
Cost:
Jiaozhou-Laizhou gas pipeline 胶莱输气管线
Jiaozhou-Laizhou gas pipeline 胶莱输气管线(胶州-莱州) is an operating natural gas pipeline in China.[29]
The pipeline runs from Laizhou Station of Yantai Zhongshi Natural Gas Company to Jiaozhou Station of Sinopec Jiqing Pipeline in Jiaozhou City, passing through Laizhou, Pingdu, Jiaozhou and Gaomi.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.7815018,"lon":119.9430008,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.2338982,"lon":120.0110016},{"lat":36.2416992,"lon":119.8150024},{"lat":36.3219986,"lon":119.7050018},{"lat":36.7815018,"lon":119.9430008},{"lat":36.9178009,"lon":119.961998},{"lat":37.0332985,"lon":119.9499969},{"lat":37.1077003,"lon":119.9369965},{"lat":37.1819992,"lon":119.9049988},{"lat":37.2919998,"lon":119.7279968}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Parent Company: PipeChina
Current capacity: 0.4 bcm/year
Proposed capacity:
Length: 65.9 mi / 106 km
Status: Operating
Start Year: 2005
Jiaozhou-Rizhao gas pipeline 胶日输气管线
Jiaozhou-Rizhao gas pipeline 胶日输气管线(胶州-日照) is an operating natural gas pipeline in China.[30]
The pipeline runs from Jiaozhou, Qingdao, Shandong to Rizhao, Shandong.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36,"lon":119,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.396385,"lon":119.988243},{"lat":35.40432,"lon":119.403239}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Parent Company: PipeChina
Current capacity: 1.7 bcm/year
Proposed capacity:
Length: 92.6 mi / 149 km
Status: Operating
Start Year: 2008
Jinan-Linzi gas pipeline 济淄输气管线
Jinan-Linzi Gas Pipeline 济淄输气管线(济南-临淄) is an operating gas pipeline in China.[31]
The pipeline runs from Ji'nan, Shandong to Linzi, Zibo, Shandong.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.8,"lon":117,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.936466,"lon":116.82381},{"lat":36.869972,"lon":118.260076}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Pipeline 1
Parent Company: PipeChina
Capacity: 2.8 billion cubic meters per year
Length: 141 km / 87.6 miles
Status: Operating[32]
Start Year: 2002[32]
Pipeline 2
The pipeline runs from Ji'nan, Shandong to Linzi, Zibo, Shandong.[31]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.8,"lon":117,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.936466,"lon":116.82381},{"lat":36.869972,"lon":118.260076}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Parent Company: PipeChina
Current capacity: 1.7 bcm/year
Proposed capacity:
Length: 75.1 mi / 121 km
Status: Proposed
Start Year:
Jinan-Qingdao Gas Pipeline 济青输气管道
Jinan-Qingdao Gas Pipeline 济南—青岛输气管道 is an operating gas pipeline in China.[33] [34]
The Qihe-Pingdu Gas Pipeline connects to the Yulin-Jinan Pipeline and Qingdao LNG Terminal . Its design pressure is 8 MPa. [35] In October 2020 ownership of the pipeline was transferred from Sinopec to PipeChina.[36]
At about 11:20 am on July 2, 2011, near the Huashan Toll Station 3 kilometers east of the Jinan-Qingdao Expressway, the Sinopec Jinan-Qingdao Gas Pipeline leaked and caught fire, causing an explosion and injuring one person.[37]
Jinan-Qingdao 1 Gas Pipeline Route
The pipeline runs from Jinan First Station, Qihe County, Dezhou City, to Jiaozhou City, Qingdao City, Shandong province, China.[33]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.74886683365399,"lon":118.35750685090655,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.811763768360464,"lon":116.76530634656393},{"lat":36.98747645426866,"lon":117.19926627266578},{"lat":36.84693866693262,"lon":117.50688343547216},{"lat":36.87770343489762,"lon":117.74308947119849},{"lat":36.943586218691834,"lon":118.11662459746336},{"lat":37.154028434713716,"lon":118.11662459746336},{"lat":37.07518098652278,"lon":118.40226910578359},{"lat":36.855729864472224,"lon":118.8032700501562},{"lat":36.785371983145396,"lon":119.22075048539341},{"lat":36.85133439207462,"lon":119.4130112121474},{"lat":36.786937729362485,"lon":119.96190752909895},{"lat":36.38445163232414,"lon":119.75728718419647},{"lat":36.2682796935487,"lon":120.03606523798976}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Jinan-Qingdao 1 Gas Pipeline 济青一线
Operator:
Owner: Shandong Natural Gas Pipeline Co., Ltd.[33]
Parent company: China Petroleum & Chemical Corporation[65%]; Shandong Luxin Investment Holdings Group Co., Ltd.[31.6%]; Other[3.4%][38]
Capacity: 5 bcm/year[34]
Length: 386 km[39]
Diameter: 800 mm[34]
Status: Operating
Start year: 2003/2014[39] [33]
Cost:
Jinan-Qingdao 2 Gas Pipeline (Qihe-Pingdu) 济青二线(齐河-平度)[40]
The pipeline runs between Qihe, Jinan, to Pingdu, Qingdao, Shandong Province, China.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.783212,"lon":118.03656,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.936466,"lon":116.82381},{"lat":36.63635,"lon":119.950784}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":6,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner: Shandong Natural Gas Pipeline Co., Ltd.[35]
Parent company: China Petroleum & Chemical Corporation[65%]; Shandong Luxin Investment Holdings Group Co., Ltd.[31.6%]; Other[3.4%][38]
Current capacity: 5.26 bcm/year[41] [34]
Proposed capacity:
Length: 223 mi / 359 km[41]
Diameter: 800mm[41] [34]
Status: operating
Start Year: 2015[42]
Cost: around 2.6 billion RMB(included the Linzi Connecting Line 临淄联络线)[41]
Jinan-Qingdao 2 Linzi Connecting Line 济青二线(临淄联络线)
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":false,"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":6,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Owner: Shandong Natural Gas Pipeline Co., Ltd.[33]
Parent company: China Petroleum & Chemical Corporation[65%]; Shandong Luxin Investment Holdings Group Co., Ltd.[31.6%]; Other[3.4%][38]
Capacity: 3.68 bcm/year[41]
Length: 34.8 km[41]
Diameter: 700 mm[41]
Status: Operating
Start year: 2015[42]
Cost:
Linzi-Qingdao Gas Pipeline 淄青输气管线
Linzi-Qingdao gas pipeline 淄青输气管线(临淄-青岛) ) is an operating natural gas pipeline in China.[43]
In October 2020 ownership of the pipeline was transferred from Sinopec to PipeChina.[36]
In March 2023, Linzi-Qingdao gas pipeline Weifang Section Upgrade Project was planned to start. This section is also known as the Qingzhou-Jiaozhou Gas Pipeline.[44]
For details of the Qingzhou-Jiaozhou Gas Pipeline, please refer to Zibo-Qingdao Gas Pipeline Weifang Section Upgrade Project .
The pipeline is connected to the Yulin-Jinan Pipeline and runs from Zhangqiu, Jinan, Shandong to Linzi, Zibo, Shandong.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.7,"lon":118.5,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.869972,"lon":118.260076},{"lat":36.63635,"lon":119.950784}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Parent Company: PipeChina
Current capacity: 1.3 bcm/year
Proposed capacity:
Length: 132 mi / 243 km[45]
Status: Operating
Start Year: 2003
Xuanzhangtun-Jining gas pipeline 宣宁输气管线
Xuangzhangtun-Jining gas pipeline 宣宁输气管线(宣张屯-济宁) ) is an operating natural gas pipeline in China.[46]
In Nov 2022, the pipeline is proposed to connect to South Trunk 南干线 under Shandong Gas Pipeline Network in Qufu City, Jining City, Shandong Province.[47]
In October 2020 ownership of the pipeline was transferred from Sinopec to PipeChina.[36]
The pipeline runs from Xuanzhantun, Shandong, to Jining, Shandong.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.1,"lon":116.2,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":35.4217704,"lon":116.490249},{"lat":36.9374392,"lon":116.8010849}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Parent Company: PipeChina
Current capacity: 0.8 bcm/year
Proposed capacity:
Length: 132 mi / 213 km[48]
Status: Operating
Start Year: 2006
Yantai LNG Terminal Transport Pipeline 烟台LNG外输管线
Yantai LNG Terminal Transport Pipeline 烟台LNG外输管线 is a construction natural gas pipeline in China.[49] [50]
The pipeline source is the West Yantai LNG Terminal . The pipeline was proposed in Shandong Oil&Gas Transport Facility Development Plan (2016-2020). [51] As of March March 2020 the pipeline was being permitted for construction,[49] which was scheduled to begin in June 2020.[52]
Yantai LNG Terminal Transport Pipeline Route
The pipeline runs between Yantai and Qihe, Jinan in Shandong Province, China. [25]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":37.333212,"lon":118.83656,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":37.711187,"lon":121.080172},{"lat":37.628137,"lon":120.877752},{"lat":37.157193,"lon":119.96706},{"lat":36.960176,"lon":119.167488},{"lat":37.01264,"lon":117.816286},{"lat":36.936466,"lon":116.82381}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":6,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator: Shandong GCL-Poly Huanya International Energy Company 山东保利协鑫环亚国际能源有限公司
Parent Company: GCL-Poly Petroleum & Natural Gas Yantai Holdings Company 保利协鑫石油天然气(烟台)控股有限公司 45.00%; Shandong Huanya Internationa Energy Distribution Center Compnay 山东环亚国际能源集散中心有限公司 40.00%; Yantai Port Group 烟台港集团有限公司 15%.
Current capacity:
Proposed capacity: 8 bcm/year[50]
Length: 329.2 mi / 530 km[53]
Diameter: 1219 mm[53]
Status: Construction[54]
Start Year:
Zilai Gas Pipeline 淄莱输气管道
Zibo-laiwu Gas Pipeline 淄莱输气管道(淄博-莱芜) is an operating gas pipeline in China[55]
The pipeline runs from Zhoucun District, Zibo City, to Laiwu District, Jinan City, Shandong Province, China.[55]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.53784330028751,"lon":117.77684885197114,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.83784330028751,"lon":117.88684885197114},{"lat":36.212280354461186,"lon":117.66639943384847}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner: Shandong Natural Gas Pipeline Co., Ltd.[56]
Parent company: China Petroleum & Chemical Corporation[65%]; Shandong Luxin Investment Holdings Group Co., Ltd.[31.6%]; Other[3.4%][57]
Capacity: 0.5 bcm/y[55]
Length: 77.1 km [58]
Diameter: 355.6 mm[58]
Status: Operating[55]
Start year: 2005[58]
Cost:
Financing:
Sishui-Yishui Gas Pipeline 泗水-沂水天然气管道
Sishui-Yishui Gas Pipeline 泗水-沂水天然气管道 is a proposed gas pipeline in China.[59] [60] [61]
The Sishui-Yishui Gas Pipeline first appeared in the "Shandong Oil and Gas Development of 14th Five-Year Plan" in January 2022. The project's budget is 5 billion RMB[59] . When finished, the project will bring a total capacity of 5-7 bcm/year to the region.[60]
The construction is divided into 3 phases. The starting point of phase one will be sourced from the Laiwu station of Zilai Gas Pipeline and ends in Yiyuan County, Zibo City, Shandong. The second phase contains two lines, the first line is sourced from the Sishui Station of China–Russia East Pipeline , and the second line is sourced from the East Trunk of Shandong Gas Pipeline Network . Both lines of the second phase connect to the phase 1 segment at the ending points. The third phase starts from Yiyuan county and separates into two branches at Badou Town, Buoshan District, Zibo City, Shandong. One branch goes to Huaneng Baiyanghe power station , and another goes to Huadian Huadian Zibo Gas power station . In October 2022, phase 1 of this project, the Laiwu-Yuyuan Segment(莱芜—沂源天然气干线), has officially been approved by the Shandong government and is at the preliminary stage of constructing design. [59]
Phase 1: Laiwu-Yiyuan Segment 一期:莱芜—沂源天然气干线
The pipeline is proposed to run from Laiwu Station of Zilai Gas Pipeline, Laiwu City, Jinan City, to Yiyuan County, Zibo City, Shandong, China.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.08,"lon":118,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.205833112913325,"lon":117.6542047175903},{"lat":36.06093444653604,"lon":117.80801328035767},{"lat":36.078694948041544,"lon":118.43148735140275}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator: Shandong Boruiyuan Clean Energy Technology CO LTD(山东博瑞源清洁能源科技有限公司)
Owner: PipeChina-China Oil & Gas Pipeline Network Corporation(国家石油天然气管网集团有限公司)
Parent company:
Capacity: 1 bcm/year
Length: 68.9 km
Diameter: 800 mm
Status: Proposed[62]
Start year:
Cost: 710.6168 Million RMB[62]
Financing:
Associated infrastructure:
Phase 2: Yishui-Yiyuan Branch 二期:沂水—沂源天然气管道
The pipeline is proposed to run from Yishui Station, Yishui County, Linyi City, to Yiyuan County, Zibo City, Shandong, China
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":35.97,"lon":118.5,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":35.789966787967465,"lon":118.62865261935409},{"lat":36.0751851729152,"lon":118.43295866533664}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":8,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator: Shandong Boruiyuan Clean Energy Technology CO LTD(山东博瑞源清洁能源科技有限公司)
Owner: PipeChina-China Oil & Gas Pipeline Network Corporation(国家石油天然气管网集团有限公司)
Parent company:
Capacity:
Length:
Diameter: 800 mm
Status: Proposed[63]
Start year:
Cost:
Financing:
Associated infrastructure: China–Russia East Pipeline ; [[1] ]
Phase 2: Sishui-Xintai-Xinanyu Segment 二期:泗水—新泰—西南峪天然气管道
The pipeline is proposed to run from Sishui Satioan, China–Russia East Pipeline, Sishui County, Jining City, to Xinanyu Station, Tai'an City, Shandong, China.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":35.9,"lon":117.3,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":35.66709365624738,"lon":117.24874626295869},{"lat":35.68090452891409,"lon":117.59632576645353},{"lat":36.20394315432179,"lon":117.66433045191994},{"lat":36.16735172569212,"lon":117.43198110990978}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator: Shandong Boruiyuan Clean Energy Technology CO LTD(山东博瑞源清洁能源科技有限公司)
Owner: PipeChina-China Oil & Gas Pipeline Network Corporation(国家石油天然气管网集团有限公司)
Parent company:
Capacity:
Length:
Diameter: 800 mm
Status: Proposed[64]
Start year:
Cost:
Financing:
Associated infrastructure:
Phase3: Yiyuan-Boshan-Zibo Branch 三期:沂源—博山—淄博经济开发区天然气干线
The pipeline is proposed to run from Yiyuan Station Yiyuan County Zibo City to Baiyanghe power station and Huadian Zibo Gas power station .
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.5,"lon":118,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.06960997458837,"lon":118.4366634853842},{"lat":36.3589954560735,"lon":118.08942554886359},{"lat":36.348090129348336,"lon":117.95552320664574},{"lat":36.45970622035639,"lon":117.91229041768196},{"lat":36.477376265493014,"lon":117.86491187615462},{"lat":36.495594278853126,"lon":117.86353858524926},{"lat":36.55580815897967,"lon":117.8812708851821},{"lat":36.64235366534436,"lon":117.96728228234505},{"lat":36.741669019084,"lon":118.0395318559619}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator: Shandong Boruiyuan Clean Energy Technology CO LTD(山东博瑞源清洁能源科技有限公司)
Owner: PipeChina-China Oil & Gas Pipeline Network Corporation(国家石油天然气管网集团有限公司)
Parent company:
Capacity:
Length:
Diameter: 800 mm
Status: Proposed[65]
Start year:
Cost:
Financing:
Associated infrastructure:
Liaocheng-Tai'an Gas Pipeline 聊城-泰安输气干线
Liaocheng-Tai'an Gas Pipeline 聊城-泰安天然气输气干线 is an operating gas pipeline in China.[60] [66] [67]
The pipeline runs from Liaocheng City to Tai'an City, Shandong, China.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.32,"lon":116.5,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.45903117249604,"lon":115.98637778322079},{"lat":36.20125296288522,"lon":117.09187696205619}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner: Jinhong Holding Group CO LTD[66] [67]
Parent company:
Capacity: 0.3 bcm/yar[60] [67]
Length: 113 km[67]
Diameter: 300 mm[60]
Status: Operating[60]
Start year: 2011[67]
Cost:
Financing:
Associated infrastructure:
Tai'an-Xintai Gas Pipeline 泰安—新泰天然气长输管线
Tai'an-Xintai Gas Pipeline 泰安—新泰天然气长输管线 is an operating gas pipeline in China.[66] [67]
The pipeline runs from Tianping Town, Daiyue District, to Xintai City in Tai'an City, Shandong, China.[68]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":35.7,"lon":117.1,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.18938468996851,"lon":117.03899105409556},{"lat":35.75928377832812,"lon":116.80965147289616},{"lat":35.67677566055593,"lon":117.59517387077673}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner: Jinhong Holding Group CO LTD(中油金鸿能源投资股份有限公司)[67]
Parent company:
Capacity:
Length: 103 km[67]
Diameter:
Status: Operating[67] [66]
Start year: 2011[67]
Cost:
Financing:
Associated infrastructure:
Zhangqiu-Qingzhou Gas Pipeline 章丘—青州天然气管道
Zhangqiu-Qingzhou Gas Pipeline 章丘—青州天然气管道 is a proposed gas pipeline in Shandong province, China.[69]
The pipeline will start at Zhangqiu East Transmission Station as part of the Jinan Eastern Urban Rerouting Project and end at the Qingzhou Branch Transmission Station in Qingzhou City. It will pass through Zhangqiu, Zhoucun, Zichuan, and Qingzhou City.[69]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.7,"lon":118.1,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.710877,"lon":117.574813},{"lat":36.769244,"lon":117.852549},{"lat":36.6398,"lon":117.922238},{"lat":36.808287,"lon":118.484172}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner: Shandong Natural Gas Pipeline Co., Ltd.[69]
Parent company: China Petroleum & Chemical Corporation(65%), Shandong Luxin Investment Holdings Group Co., Ltd.(35%)[70]
Capacity: 2.82 bcm/y[69]
Length: 113 km (Trunk line 112 km; Connecting line 1 km)[69]
Diameter: 600 mm (Trunk line); 500 mm (Connecting line)[69]
Status: Proposed[71]
Start year:
Cost: 943 million RMB[69]
Financing: 643.05 million RMB (Bank loan); 300 million RMB (Capitalization, including 100 million RMB Special bonds) [69]
Associated infrastructure: Linzi-Qingdao Gas Pipeline[69]
Zibo-Qingdao Gas Pipeline Weifang Section Upgrade Project 淄青线潍坊段改造工程
Zibo-Qingdao Gas Pipeline Weifang Section Upgrade Project 淄青线潍坊段改造工程(又名:青州至胶州天然气管道工程) is a proposed gas pipeline in Shandong province, China.[72]
The pipeline is proposed to run from Qingzhou Distribution Station of Zhangqiu-Qingzhou Gas Pipeline to Jiaohe Farm in Gaomi City, Weifang.[73]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.6,"lon":119.2,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.702916,"lon":118.518083},{"lat":36.54086,"lon":119.734349}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner: Shandong Natural Gas Pipeline Co., Ltd.[72]
Parent company: China Petroleum & Chemical Corporation [65.00%]; Shandong Luxin Investment Holdings Group Co., Ltd. [35%][74]
Capacity: 8.3 bcm/y[73]
Length: 189 km[73]
Diameter: 813mm[73]
Status: Proposed[75]
Start year:
Cost: 1880 million RMB[73]
Financing:
Associated infrastructure: Zhangqiu-Qingzhou Gas Pipeline
Weifang Ring Network Gas Pipeline 潍坊市天然气环网
Weifang Ring Network Gas Pipeline 潍坊市天然气环网 is a proposed gas pipeline in Weifang, Shandong province, China.[76]
The pipeline is proposed to run circling Weifang, passing through Changyi City, Binhai District, Shouguang City, Changle County, Zhucheng City, Anqiu City, Fangzi District, Gaomi City, Xiashan and other counties and urban areas.
[77]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.6,"lon":119.2,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.630865,"lon":119.205309}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner: Weifang Energy Group Co., Ltd.[76]
Parent company: Weifang Chuangchen Construction Investment Co., Ltd.[78]
Capacity: 5 bcm/y[79]
Length: 670 km (400 km of the trunk pipeline and 270 km of the branch pipelines)[77]
Diameter: 800 mm (The trunk pipeline); 300-500 mm(The branch pipelines)[77]
Status: Proposed[80]
Start year: 2025[81]
Cost: 6500 million RMB[77]
Financing:
Associated infrastructure: Sinopec Longkou LNG Terminal, Jinan-Qingdao Gas Pipeline, Tai'an-Qingdao-Weihai Gas Pipeline, Shandong Gas Pipeline Network East Trunk[77]
Weifang-Dongying Gas Pipeline 潍坊-东营天然气输气管道
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor .
Sub-articles:
Weifang-Dongying Gas Pipeline 潍坊-东营天然气输气管道 is an operating gas pipeline in Shandong province, China.[82]
The pipeline runs from the Linqu Gas Transmission Station of PetroChina Taiqingwei Pipeline, passes through Linqu County, Qingzhou City, Shouguang City and Dongying Guangrao Binhai Economic Development Zone in Weifang, and ends in Dongying Economic Development Zone, Dongying.[82]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.8,"lon":118.5,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.554788,"lon":118.537935},{"lat":36.690245,"lon":118.441849},{"lat":36.836213,"lon":118.762619},{"lat":37.057643,"lon":118.372052}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":8,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner: Shandong Lurun Natural Gas Co., Ltd.[82]
Parent company: PetroChina Company Limited[30%]; Shandong Luxin Investment Holdings Group Co., Ltd.[9.5%];Other[60.5%][83]
Capacity: 1.815 bcm/y[82]
Length: 126.6 km[82]
Diameter: 508 mm[82]
Status: Operating[82]
Start year: 2015[82]
Cost: 470 million RMB[82]
Financing:
Associated infrastructure: Tai'an-Qingdao-Weihai Gas Pipeline[82]
Guangrao-Dongying Gas Pipeline 广饶—东营港天然气管道
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor .
Sub-articles:
Guangrao-Dongying Gas Pipeline 广饶—东营港天然气管道 is a construction gas pipeline in Shandong province, China.[84]
It will provide natural gas to numerous large refining and chemical enterprises, as well as small and medium industrial users, in six industrial parks in Dongying.[85] The project will be constructed in two phases, and the first phase started on October 16, 2019.[84]
The pipeline is proposed to run from the Guangrao Distribution Station of Jinan-Qingdao Pipeline 2 to the proposed Dongying Port LNG Terminal (planned construction), passing through Guangrao County, Dongying District, Kenli District, Lijin County and Hekou District.
[85]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":37.5,"lon":118.6,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":38.096613,"lon":118.932965},{"lat":37.083895,"lon":118.4388}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":8,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner: Shandong Bairong Natural Gas Technology Co., Ltd.[85]
Parent company: Shandong Bairong Natural Gas Technology Co., Ltd.[86]
Capacity: 7 bcm/y[85]
Length: 200.9 km (178.8 km of the trunk pipeline and 22.1 km of the branch pipelines)[85]
Diameter: 800/300 mm (800mm of the trunk pipeline and 300mm of the branch pipelines)[85]
Status: Construction[87]
Start year:
Cost: 2221.8665 million RMB[85]
Financing:
Associated infrastructure: Jinan-Qingdao Pipeline 2; Dongying Port LNG Terminal[85]
Dongying Ring Network Gas Pipeline 东营市天然气管道环网
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor .
Sub-articles:
Dongying Ring Network Gas Pipeline 东营市天然气管道环网 is a proposed gas pipeline in Dongying, Shandong province, China.[88]
The pipeline is proposed to run from the Shengli Industrial Park distribution station to the Dongying Port LNG Terminal, passing through Dongying District, Kenli District, Lijin County, and Hekou District. The line is all located in Dongying, Shandong Province, China.
[89]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":37.3,"lon":118.6,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":37.392553,"lon":118.675641}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":8,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner: Dongying Chengtou Pipeline Natural Gas Co., Ltd.[88]
Parent company: Dongying Urban Construction Development Group Co., Ltd.[59.89%]; Shandong Tianhui Gas Co., Ltd.[20.00%]; Other[20.11%][90]
Capacity:
Length: 201.3 km[89]
Diameter: 500 mm (500mm of the trunk pipeline and 500mm/400mm/300mm of the branch pipelines)[89]
Status: Proposed[91]
Start year:
Cost: 1020 million RMB[89]
Financing:
Associated infrastructure: Shengli Industrial Park distribution station, Dongying Port LNG Terminal[89]
Dongjiakou-Yishui-Zibo Gas Pipeline 董家口-沂水-淄博天然气管道
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor .
Sub-articles:
Dongjiakou-Yishui-Zibo Gas Pipeline 董家口-沂水-淄博天然气管道 is a proposed gas pipeline in Shandong province, China.[92]
The pipeline is laid in the same ditch as the approved Dongjiakou-Yishui-Zibo oil pipeline.[92]
The pipeline is proposed to run from Dongjiakou Gas Transmission Station in West Coast New Area, Qingdao, to Yangzhuang Distribution Station, Yishui County, Linyi. There also have two branch lines: Zhengben Branch Line (from Yangzhuang Distribution Station, Yishui County, Linyi, to Louzi First Distribution Station, Linzi District, Zibo); Yishui Branch Line (from Yangzhuang Distribution Station, Yishui County, Linyi, to Yishui Gas Transmission Station, Yishui County, Linyi).[93]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.7,"lon":117.9,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.761017,"lon":117.956433}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":8,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner: Shandong Huihui Gas Co., Ltd.[92]
Parent company: Zibo Linzi Qingyuan Materials Storage & Transportation Co., Ltd.[100%][94]
Capacity: 3 bcm/y[92]
Length: 359 km[92]
Diameter: 711 mm[92]
Status: Proposed[95]
Start year:
Cost: 3000 million RMB[92]
Financing:
Associated infrastructure: Tai'an-Qingdao-Weihai Gas Pipeline
Yantai Ring City High Pressure Gas Pipeline 烟台市区天然气环城高压管线
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor .
Sub-articles:
Yantai Ring City High Pressure Gas Pipeline 烟台市区天然气环城高压管线 is a proposed gas pipeline in Yantai, Shandong province, China.[96]
The pipeline is proposed to run from Dajijia Gate Station in the Development Zone, passing through Laishan Gate Station, and ending at Valve Room 10, Jiuguan Village, Muping District. It passes through the four districts of Yantai: Development Zone, Fushan District, Laishan District and Muping District. The whole pipeline is in Yantai, Shandong Province, China.[97]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":37.4,"lon":121.4,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":37.42639,"lon":121.441897}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":8,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner: Yantai Xin'ao Clean Energy Co., Ltd.[96]
Parent company: Yantai Lantian Investment Development Group Co., Ltd.[50%]; Xinneng (Hong Kong) Energy Investment Limited[16.32%]; Other[33.68%][98]
Capacity: 3 bcm/y[99]
Length: 127.126 km (114.33 km of the trunk pipeline and 12.80 km of the branch pipelines)[96]
Diameter: 600/500 mm (600mm of the trunk pipeline and 500mm of the branch pipelines)[96]
Status: Proposed[100]
Start year:
Cost: 557.63 million RMB[96]
Financing:
Associated infrastructure: Pingdingshan-Tai'an Branch, Tai'an-Qingdao-Weihai Gas Pipeline, Yantai West Port Area LNG Terminal[97]
Laishan-Penglai-Longkou Gas Pipeline 烟台莱山-蓬莱-龙口天然气管道
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor .
Sub-articles:
Laishan-Penglai-Longkou Gas Pipeline 烟台莱山-蓬莱-龙口天然气管道 is a cancelled gas pipeline in Yantai, Shandong province, China.[101]
The Gaspipeline was proposed to include a trunk line and a branch line.[101]
Since the first announcement of the environmental impact assessment of the pipeline in 2018, no relevant information has been found, so we believe that the plan to build the pipeline has been cancelled.
The pipeline was proposed to run from Yantai distribution station of Tai'an-Qingdao-Weihai Gas Pipeline, passes through Laishan District, Zhifu District, Fushan District, Development Zone, Penglai City and Longkou City, and docks with the Longkou Terminal Station of Laixi-Longkou Gas Pipeline.[101]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":37.7,"lon":120.8,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":37.505728,"lon":121.432727},{"lat":37.534466,"lon":121.379912},{"lat":37.780101,"lon":120.768369},{"lat":37.64953,"lon":120.473675}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":8,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner: CNOOC Risheng Hengchen Natural Gas Pipeline Co., Ltd.[101]
Parent company: Shanghai Shurui Construction Engineering Co., Ltd.[100%][102]
Capacity: 4.75 bcm/y[101]
Length: 138 km (119.9 km of the trunk line and 18.1km of the branch line)[101]
Diameter: 610/406.4 mm (610mm of the trunk pipeline and 406.4mm of the branch pipelines)[101]
Status: Cancelled (presumed)
Start year:
Cost: 942.08 million RMB[101]
Financing:
Associated infrastructure: Tai'an-Qingdao-Weihai Gas Pipeline; Laixi-Longkou Gas Pipeline[101]
Zibo City High Pressure Gas Pipeline (Phase 1) 淄博市全域高压燃气管网(一期)
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor .
Sub-articles:
Zibo City High Pressure Gas Pipeline (Phase 1) 淄博市全域高压燃气管网(一期) is a proposed gas pipeline in Zibo, Shandong province, China.[103]
The pipeline is proposed to run from the Gaoqingmen Gate Station to the Kunlunmen Gate Station, passing through Gaoqing County, Huantai County, High-tech Zone, Economic Development Zone, Linzi District, Zhangdian District, and Zichuan District. The whole line is located in Zibo City.[104]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.8,"lon":118,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.808256,"lon":118.086262}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":8,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner: Zibo Energy Group Natural Gas Pipe Network Co., Ltd.[104]
Parent company: Zibo Efficient Finance Holding Co., Ltd.[105]
Capacity: 3 bcm/y[103]
Length: 144 km (121.5 km of the trunk pipeline and 22.5 km of the branch pipelines)[103]
Diameter: 600/300 mm (600 mm for the trunk line and 300 mm for the branches)[103]
Status: Proposed[106]
Start year:
Cost: 869.16 million RMB[104]
Financing:
Associated infrastructure: Tianjin LNG Ternminal Tangguantun-Zouping Gas Pipeline, Tai'an-Qingdao-Weihai Gas Pipeline Zibo Branch[103]
Shandong Gas Pipeline Network South Trunk Zaozhuang Branch 山东管网南干线枣庄支线天然气管道
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor .
Sub-articles:
Shandong Gas Pipeline Network South Trunk Zaozhuang Branch 山东管网南干线枣庄支线天然气管道 is a proposed gas pipeline in Shandong province, China.[107]
The pipeline is proposed to run from the Sishui Pigging Station on the south trunk line of Miaoguan Town, Sishui County, Jining, Shandong province, to Kelezhuang Village, Taierzhuang District, Zaozhuang, Shandong province.[107]
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":35,"lon":117.3,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":35.653209,"lon":117.394257},{"lat":34.520042,"lon":117.446776}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Operator:
Owner: Shandong Southeast Pipeline Natural Gas Co., Ltd.[107]
Parent company: China Petroleum & Chemical Corporation [50%]; Shandong Luxin Investment Holdings Group Co., Ltd.[45.2%]; Other[4.8%][108]
Capacity: 3.65 bcm/y[107]
Length: 195.2 km[107]
Diameter: 800 mm[107]
Status: Proposed[109]
Start year:
Cost: 1300 million RMB[110]
Financing:
Associated infrastructure: Shandong Gas Pipeline Network South Trunk[107]
Articles and resources
References
↑ 1.0 1.1 "山东省石油天然气中长期发展规划 (2016-2030 年)--- 山东省发展和改革委员会" (PDF) . 2017-01. CS1 maint: url-status (link )
↑ "中俄东线天然气管道中段正式投产运营_刘畅_中国政府网" . www.gov.cn . 2020-12-03.{{cite web }}
: CS1 maint: url-status (link )
↑ "山东省能源发展 "十四五"规划--山东省人民政府" (PDF) . nyj.shandong.gov.cn . 2021-08. CS1 maint: url-status (link )
↑ 4.0 4.1 4.2 山东石油天然气股份有限公司山东管网西干线项目环境影响报告书 , Shandong Ecology and Environment Bureau, December, 2019
↑ 5.0 5.1 山东管网南干线天然气管道工程环境影响评价公众参与说明 山东省天然气管道有限公司, May 2020
↑ 实力再获认可!石化油服(600871.SH)中标62.71亿元山东管网东干线项目 , 中商网, 2022-03-04
↑ 7.0 7.1 山东管网东干线天然气管道工程 , 黄海晨刊, 2022-11-02
↑ 石化油服(600871.SH)中标山东管网东干线天然气管道工程项目 , 智通财经网,2022-03-01
↑ 9.0 9.1 山东管网东干线天然气管道工程举行开工仪式 , 大众日报,2022-03-09
↑ 省天然气环网东干线289处穿越施工全部完成 , 九派快讯, 2024-04-23
↑ 11.0 11.1 11.2 聚焦丨项目获批!山东天然气管网北、西干线将开建! 经济导报, April 26, 2020
↑ 山东管网西干线天然气管道工程开工 大众日报, July 26, 2020
↑ 13.0 13.1 13.2 中国电力招标网 (2021-06-24). "山东省西干线天然气有限公司山东管网西干线项目(跟踪3)_拟在建项目_中国电力招标网" . www.dlzb.com . Retrieved 2021-10-12 .
↑ 山东加快推进油气基础设施建设 , 大众日报, 2022-05-17
↑ 山东天然气环网项目首个干线工程开工 大众日报, July 20, 2020
↑ 山东管网南干线天然气管道工程举行开工仪式 山东省国资委网站, July 22, 2020
↑ 17.0 17.1 17.2 "山东管网南干线天然气管道工程举行开工仪式_鲁信" . www.sohu.com . Retrieved 2021-10-12 .
↑ 18.0 18.1 鲁信集团:聚焦多点发力 谱写绿色金融大文章 , 大众网, 2024-02-05
↑ 潍坊寿光市自然资源和规划局着力构建高质量发展空间体系 , 大众网, 2024-02-29
↑ 20.0 20.1 20.2 20.3 20.4 山东LNG输气干线工程安全设施竣工验收 , Sinopec News, Sep. 19, 2019
↑ 21.0 21.1 关于印发全省油气输送设施规划建设方案(2016-2020年)的通知 ,山东省发改委, 2016-10-24
↑
"China's Sinopec boosts capacity at Qingdao LNG terminal" . LNG Prime . 2021-08-24. Retrieved 2021-10-26 .
↑ "多项国内首次!董家口山东LNG二期工程项目第一座储罐顺利升顶" . Retrieved 2021-10-26 .{{cite web }}
: CS1 maint: url-status (link )
↑ 24.0 24.1 中国石化山东LNG接收站二期工程建成 , 中国化工报, 2021-08-25
↑ 25.0 25.1 25.2 烟威用上西部地区天然气 大众日报, Sep 16, 2015.记者 左丰岐
↑ 【调查报告】中石油泰青威天然气管道“2019.3.20”泄漏爆炸着火事故调查报告 , 搜狐网,2020/07/02
↑ 泰青威天然气管道泰安至青岛段运行压力进入稳压阶段 中国石油报, October 11,2016
↑ 泰青威输气管线开始试运行 中国能源网, June 17,2011
↑ 青岛天然气供应日增15万立方 中石化胶莱管线竣工(图) , Sohu, Dec. 26, 2005
↑ 日天然气长输管线日照段近日开工建设 , gas.in-en.com, Sep. 5, 2008
↑ 31.0 31.1 山東濟子天然氣長輸管道工程開工 , China Gas, Jan. 3, 2020
↑ 32.0 32.1 中国石化“气化山东”为淄博供气超110亿立方米 , 淄博日报, 2022-06-20
↑ 33.0 33.1 33.2 33.3 33.4 济南—青岛输气管道工程经广饶 或年底供气东营 凤凰山东, 2014/04/23
↑ 34.0 34.1 34.2 34.3 34.4 济南市燃气专项规划(2021-2035年) 济南市住房和城乡建设局;山东建筑大学设计集团有限公司;济南市规划设计研究院, September 2022
↑ 35.0 35.1 济南-青岛输气管道二线工程控制效果评价 , 中石化安全工程研究院有限公司, 2017-08-30
↑ 36.0 36.1 36.2 重磅:国家管网正式运营! , dy.163.com, Oct. 9, 2020
↑ 中石化济青输气管线天然气泄漏引发大爆炸 , 大众网--生活日报, 2011-07-03
↑ 38.0 38.1 38.2
山东省天然气管道有限责任公司 , QCC, Research date: 2023-07-26
↑ 39.0 39.1 济南至青岛天然气管道全线贯通 , 气体分离设备商务网, 2003/02/22
↑ 油气管网基本情况 Sinopec Official Website, 2017
↑ 41.0 41.1 41.2 41.3 41.4 41.5 41.6 山东省环境保护厅关于济南-青岛输气管道二线工程噪声和固体废物污染防治设施竣工环境保护验收合格的函 鲁环验〔2018〕8号, 山东省生态环境厅, 2018/05/23
↑ 42.0 42.1 中国石化天然气公司两大管道工程贯通 中国石油化工集团公司, 09-29-2015
↑ 宣章屯-济宁输气管道缺陷治理换管项目施工总承包招标公告 , Petrochemical Industry Trade Information Network, Jun. 2, 2018
↑ 潍坊市生态环境局关于山东省天然气管道有限责任公司青州至胶州天然气管道工程(淄青线潍坊段改造工程)拟审批公示 , 潍坊市生态局, 2023-03-07
↑ 中国石化油气管网设施开放相关信息(2017版) , Sinopec, accessed September 2020
↑ 宣章屯-济宁输气管道缺陷治理换管项目施工总承包招标公告 , Petrochemical Industry Trade Information Network, Jun. 2, 2018
↑ 宣宁线与山东管网南干线联通工程(曲阜站联通) , 河南油田工程科技股份有限公司, Nov 2022.
↑ 中国石化油气管网设施开放相关信息(2017版) , Sinopec, accessed September 2020
↑ 49.0 49.1 国家发展改革委关于烟台港西港区液化天然气接收站项目核准的批复 发改能源〔2020〕33号, 01-09-2020
↑ 50.0 50.1 烟台LNG:中国烟台LNG接收站获得政府批准 中国工业新闻网, 03-21-2020
↑ 山东省油气输送设施规划建设方案(2016-2020年) 山东省发展和改革委员会,山东省经济和信息化委员会,山东省交通运输厅, October 24, 2016
↑ 烟台西港LNG接收站6月开工 惠及山东六座城市 05-12-2020
↑ 53.0 53.1 【天然气】协鑫烟台LNG接收站项目储气罐基桩完成69% , 华气能源猎头, 2022/04/22
↑ 中建八局四公司基础设施公司烟台LNG项目二分部开展管道类项目交流学习 , 大众网, 2024-04-22
↑ 55.0 55.1 55.2 55.3 中国石化油气管网设施基本情况(2017 版) 重庆石油天然气交易中心, 2017
↑ 对淄莱线依法履行管道保护义务的监管情况(2021年8月4日) , 淄川区人民政府, 2021-08-05
↑
山东省天然气管道有限责任公司 , QCC, Research date: 2023-07-26
↑ 58.0 58.1 58.2 山东管道首次应用非接触式管道磁应力检测技术 中国石化新闻网, 2019/09/26
↑ 59.0 59.1 59.2 3家世界500强企业花落沂源! 搜狐, 2022/12/08
↑ 60.0 60.1 60.2 60.3 60.4 60.5 济南市燃气专项规划(2021-2035年) 济南市住房和城乡建设局/山东建筑大学设计集团有限公司/济南市规划设计研究院, September 2022
↑ 山东博瑞源公司“泗水—沂水天然气干线项目”建设启动会议召开 沂源县人民政府, 2022/07/07
↑ 62.0 62.1 山东省生态环境厅关于莱芜—沂源天然气干线项目环境影响报告书的批复 , 山东省生态环境厅, 2024-04-29
↑ 泗水-沂水天然气管道项目二期社会稳定风险分析公众参与公示 , 采招网, 2024-03-21
↑ 历山街道2023年工作要点 , 沂源县历山街道办事处, 2023-02-07
↑ 3家世界500强企业缘何花落沂源历山 , 淄博发布, 2022-12-08
↑ 66.0 66.1 66.2 66.3 中油金鸿能源投资股份有限公司跟踪评级报告 , 中油金鸿能源投资股份有限公司 ,2017
↑ 67.0 67.1 67.2 67.3 67.4 67.5 67.6 67.7 67.8 67.9 中油金鸿华东投资管理有限公司 一览(YL1001.com), retrieved March 2023
↑ 金鸿能源(000669)深度研究:产业链完整的民营燃气巨头 , 新浪财经, 2017/01/12
↑ 69.0 69.1 69.2 69.3 69.4 69.5 69.6 69.7 69.8 章丘至青州天然气管道工程项目实施方案 , 山东省天然气管道有限责任公司, October 2022
↑ 山东省天然气管道有限责任公司 , 企查查, research date: 2023-07-17
↑ 济南都市圈发展规划重磅出炉! , 山东省政府网站, 2024-03-08
↑ 72.0 72.1 潍坊市生态环境局关于山东省天然气管道有限责任公司青州至胶州天然气管道工程(淄青线潍坊段改造工程)拟审批公示 , 潍坊市生态局, 2023-03-07
↑ 73.0 73.1 73.2 73.3 73.4 青州至胶州天然气管道工程 , 中国电力招标网, 2023-03-09
↑ 山东省天然气管道有限责任公司 , QCC, Research date: 2023-07-19
↑ 青州至胶州天然气管道工程(淄青线潍坊段改造工程)建设方案批前公示 , 坊子区自然资源和规划分局, 2024-04-22
↑ 76.0 76.1 潍坊市天然气管网建设项目工程总承包招标公告 , 网易, 2023-01-06
↑ 77.0 77.1 77.2 77.3 77.4 重点项目展示——潍坊市天然气环网项目 , 潍坊滨城投资开发有限公司, 2023-06-06
↑ 潍坊市能源集团有限公司 , QCC, Research date: 2023-07-19
↑ 时代向前 城市向上:潍坊滨城投资践行国企之担当 夯实民生之根 , 中国报道, 2023-05-11
↑ 亮出更好潍坊“新颜值” 塑造城市发展“好气质” , 潍坊融媒, 2023-12-25
↑ 一网织成百态活——潍坊滨城公司系统化擘画民生产业布局掠影 , 鲁网潍坊, 2022-08-10
↑ 82.0 82.1 82.2 82.3 82.4 82.5 82.6 82.7 82.8 82.9 潍坊-东营天然气管道二期工程送气成功服务600万人口 , 搜狐网, 2015-12-14
↑ 山东鲁润天然气有限公司 , QCC, Research date: 2023-07-19
↑ 84.0 84.1 广饶—东营港天然气管道工程顺利开工 , 齐鲁晚报东营在线, 2019-10-19
↑ 85.0 85.1 85.2 85.3 85.4 85.5 85.6 85.7 东营市生态环境局2020年11月19日拟受理建设项目公示 , 东营市生态环境局, 2020-11-19
↑ 山东百荣天然气技术有限责任公司 , QCC, Research date: 2023-07-20
↑ 资中县乡镇燃气管网改造提升及配套设施建设项目(一期)及城市燃气管道等老化更新改造建设项目打捆招标评标结果公示 , 内江市公共资源交易服务中心, 2024-05-11
↑ 88.0 88.1 东营市天然气管道环网工程 , 中国能源招标网, 2022-09-15
↑ 89.0 89.1 89.2 89.3 89.4 东营市城投管道天然气有限责任公司东营市天然气管道环网工程社会稳定风险分析信息公示 , 东营市人民政府, 2022-06-20
↑ 东营市城投管道天然气有限责任公司 , QCC, Research date: 2023-07-20
↑ 市城建集团中石化济青二线至中心城气源引进项目部荣获“全市高质量发展创新实干先进集体”荣誉称号 , 东营市人民政府国有资产监督管理委员会, 2024-02-21
↑ 92.0 92.1 92.2 92.3 92.4 92.5 92.6 投资30亿、途经4市6县,山东这条天然气管道将开建 , 经济导报, 2022-01-25
↑ 董家口—沂水—淄博输气管道工程选址意见的批前公示 , 山东省自然资源厅, 2021-08-19
↑ 东营市城投管道天然气有限责任公司 , QCC, Research date: 2023-07-20
↑ 港产城融合发展!西海岸新区加快推进世界一流海洋港口建设 , 搜狐网, 2023-08-18
↑ 96.0 96.1 96.2 96.3 96.4 【烟台市区天然气环城高压管线工程】环境影响评价文件审批决定 , 烟台市生态环境局, 2019-12-26
↑ 97.0 97.1 烟台市区天然气环城高压管线工程 设计方案顺利通过专家评审 , 烟台市城市管理局, 2017-09-25
↑ 烟台新奥燃气发展有限公司 , QCC, Research date: 2023-07-21
↑ 烟台市区天然气环城高压管线工程正式开工 , 烟台蓝天投资开发集团有限公司, 2019-01-01
↑ 烟台市区天然气环城高压管线工程1#阀室、2#阀室、3#阀室、4#阀室、5#门站选址意见的批前公示 , 烟台市自然资源和规划局, 2023-11-13
↑ 101.0 101.1 101.2 101.3 101.4 101.5 101.6 101.7 101.8 烟台莱山-蓬莱-龙口天然气管道工程环境影响评价第一次公示 , 烟台市环境保护局, 2018-02-08
↑ 中海日升恒宸天然气管道有限公司 , QCC, Research date: 2023-07-21
↑ 103.0 103.1 103.2 103.3 103.4 淄博市生态环境局关于2022年5月13日建设项目 环境影响评价文件受理情况的公示 , 淄博市生态环境局, 2022-05-13
↑ 104.0 104.1 104.2 淄博市能源集团天然气管网有限公司淄博市全域高压燃气管网工程 , 电力招标网,2023-06-28
↑ 淄博市能源集团天然气管网有限公司 , QCC, Research date: 2023-07-26
↑ [https://www.zibo.gov.cn/gongkai/site_srmzfbgs/channel_shizhengfuwenjian/doc_661c858e32ee795debb51d00.html 淄博市人民政府
关于同意在市级文物保护单位皇姑庵遗址、太平遗址保护范围内建设淄博市全域高压燃气管网工程(一期)建设工程的批复], 淄博市人民政府, 2024-04-10
↑ 107.0 107.1 107.2 107.3 107.4 107.5 107.6 山东管网南干线枣庄支线天然气管道工程 , 山东省发展和改革委员会, 2021-12-01
↑ 山东省东南管道天然气有限公司 , QCC, Research date: 2023-07-24
↑ 济政办发〔2023〕8号 关于印发济宁市扩大内需三年行动计划(2023—2025年)的通知 , 济宁市人民政府办公室, 2023-11-01
↑ 枣庄市人民政府关于下达2023年市重点项目名单的通知 , 枣庄市人民政府, 2023-02-02
Articles and resources
References