Search results

From Global Energy Monitor
Results 1 – 20 of 20
Advanced search

Search in namespaces:

  • Nigeria-Morocco Gas Pipeline (category Proposed pipelines in Morocco)
    m/year Length: 5,660 km Status: Proposed Start year: 2046 Cost: US$25 billion The Nigeria-Morocco Gas Pipeline was proposed in a December 2016 agreement between
    15 KB (2,395 words) - 06:42, 17 September 2023
  • Morocco FSRU (category Proposed LNG terminals in Morocco)
    Morocco FSRU Terminal is a proposed LNG import terminal in Morocco. The FSRU is expected to be built in Mohammedia Port, Morocco. Loading map... {"type":"SATELLITE"
    5 KB (563 words) - 23:56, 21 June 2024
  • Maghreb-Europe Gas Pipeline (category Existing pipelines in Spain)
    well as Morocco with natural gas. The pipeline was first proposed in 1963 by French companies. This proposal foresaw prolongation of the pipeline to Strasbourg
    8 KB (1,004 words) - 21:18, 19 June 2024
  • is a proposed liquefied natural gas (LNG) import terminal in Morocco. The terminal is proposed to be located in Nador West Med Port, Nador, Morocco. Loading
    6 KB (660 words) - 20:34, 28 June 2024
  • Jorf Lasfar LNG Terminal (category LNG terminals in Morocco)
    imports of LNG. In April 2019, Morocco was planning to tender the facility in Jorf Lasfar before the end of the year. In early 2024, Morocco announced plans
    6 KB (703 words) - 23:57, 21 June 2024
  • LNG Terminal is a proposed liquefied natural gas (LNG) import terminal in Western Sahara. The terminal is proposed to be located in the Port of Dakhla
    6 KB (654 words) - 23:54, 21 June 2024
  • Trans-Sahara Gas Pipeline (category Proposed pipelines in Nigeria) (section Rival pipeline)
    Length: 4,128 km 1,037 km in Nigeria 841 km in Niger 2,310 km Algeria Diameter: 48, 56 in Cost: US$13 billion Status: Proposed Start year: Originally 2015
    18 KB (1,761 words) - 20:29, 8 October 2024
  • of U.S. coal exports in 2010, up from 63% in 2000. Over 68% of total U.S. coal exports in 2010 were coking coal, which is used in making iron and steel
    51 KB (5,611 words) - 11:07, 30 April 2021
  • West African Gas Pipeline (category Existing pipelines in Ghana)
    Understanding was signed in 1999 and the project implementation agreement was signed in 2003. The project was commenced in 2003 and began operating in 2011. The project
    8 KB (1,246 words) - 18:48, 7 November 2022
  • activities, in accordance with environmental regulations. The Nigeria-Morocco Gas Pipeline, an extension of the West African Gas Pipeline, was proposed in 2016;
    49 KB (5,217 words) - 19:26, 30 September 2024
  • Tendrara Export Pipeline (category Proposed oil and gas pipelines in Morocco)
    Tendrara Export Pipeline is a proposed natural gas pipeline in Morocco, which would connect the Tendrara gas fields to the Maghreb-Europe Gas Pipeline. The pipeline
    2 KB (302 words) - 14:17, 28 October 2021
  • NewMed FLNG Terminal (category Proposed LNG terminals in Israel) (section War in Ukraine and European energy crisis)
    Kuwait in 2009, Jebel Ali FLNG Terminal in Dubai in 2010, Hadera LNG Terminal in Israel in 2013, Jordan through Aqaba Jordan LNG Terminal in 2015, Ruwais
    15 KB (1,789 words) - 17:10, 6 June 2024
  • Nigeria–Libya Gas Pipeline is a proposed gas transmission pipeline in Africa. The pipeline is proposed to run from Nigeria's gas production regions to
    2 KB (174 words) - 18:52, 3 October 2024
  • El Aricha-Beni Saf Gas Pipeline (category Proposed pipelines in Algeria)
    "locations":[]} The pipeline was proposed in September 2018 and would connect to two others that link to Spain, the Pedro Duran Farell (GPDF) pipeline which runs
    2 KB (260 words) - 20:08, 21 September 2022
  • especially in western North Africa, i.e. Morocco. Specific event examples that have impacted Mediterranean nations are summarized in the table below: In addition
    76 KB (5,465 words) - 21:58, 26 November 2024
  • reviewed on a rolling basis: Proposed: Projects that have appeared in corporate or government plans, or in news reports, in either pre-permit or permitted
    27 KB (1,801 words) - 19:18, 7 April 2022
  • total costs of pipelines that are proposed or in construction. Figure 4 shows km of pipeline in development across regions, as presented in Table 2. Figures
    17 KB (1,270 words) - 19:06, 7 April 2022
  • highest rate in the country at 28.7%. In response to high unemployment, in 2017, protestors staged a sit-in at the Kamour pumping station, resulting in an agreement
    63 KB (6,003 words) - 13:41, 26 June 2024
  • livelihoods, etc. The 5,600-km long Nigeria-Morocco Gas Pipeline will extend the West Africa Gas Pipeline to Tangiers, Morocco and Cádiz, Spain, with connections
    86 KB (9,650 words) - 20:28, 20 June 2024
  • sales in 2022 grew by 12% as compared to sales in 2021. Almost 30% of the population in Uganda lives in rural areas. However, research published in 2021
    143 KB (15,013 words) - 19:32, 8 October 2024