Itaporanga-Carmópolis Pipeline
From Global Energy Monitor
• [español]
Itaporanga-Carmópolis Pipeline is an operating gas pipeline running within Brazil. The pipeline forms the Catu-Pilar Pipeline network along with the Catu-Itaporanga Gas Pipeline and Carmópolis-Pilar Gas Pipeline.[1]
Location
The pipeline starts in Itaporanga and runs to Carmópolis.[2]
Project Details
- Operator: Transportadora Associada de Gás S.A.[2][3]
- Parent company: Engie (65%), CDPQ (Caisse de dépôt et placement du Québec) (35%)[3]
- Capacity: 12.7 million m³/day (4.6 bcm/year)[4]
- Length: 68.5 km[4]
- Diameter: 26 inches[4]
- Status: Operating[2]
- Start Year: 2006[5]
- Associated infrastructure:
Articles and resources
References
- ↑ "CARACTERÍSTICAS TÉCNICAS E OPERACIONAIS DAS INSTALAÇÕES DE TRANSPORTE" (PDF). TAG. October 23, 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 "Sistema de Transporte – TAG". ntag.com.br (in português do Brasil). Retrieved 2021-06-07.
- ↑ 3.0 3.1 "Transportadora Associada de Gás - TAG". Engie. Retrieved 2022-08-04.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 4.0 4.1 4.2 "AUTORIZAÇÃO Nº 532, DE 30 DE JULHO DE 2020". Government of Brazil. July 31, 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Thiago Reboredo (July 6, 2006). "Petrobras inaugura trecho do Projeto Malhas Nordeste". GasNet.
{{cite web}}
: CS1 maint: url-status (link)